Company Profile
HSE - Q Policy
IMS Scope
Kişisel Verilerin Korunması
Certificates
Completed Projects
On-Going Projects
Natural Gas Distrubition and Conversion Projects
Fuel-Oil And Petrochemical Storage Facilities
Airport Jet-Fuel Hydrant and Storage Systems
Underground and Aboveground Pipelines and Installation of Equipments
Industrial Plants And Treatment Facilities
Turnkey Civil and Construction Projects
Electrical And Automation Systems
Fire Detection And Control Systems
Contact Adresses
To meet the additional steam demand of the new investment projects of the ETI HOLDING KIRKA BORAX COMPANY a new 70t/h Steam Boiler and associated units has been fabricated and erected on turnkey basis. In the scope of this project; - A 70t/h Steam Boiler of SD-33 Type has been bought from Foster Wheeler Iberia S.A. (FWISA) and fabricated boiler has been erected on site. - All the disassembling, erection, revisions and civil works for the connection of the new units to the existing units have been done. - A new steel chimney of 2 meters diameter with a height of 20 meters was fabricated and erected. - A new 30t/h capacity Demoralized Water Unit, a new degasifier with a capacity of 80m³/h and a 80m³/h feed water heat exchanger, condensate and raw water pumps and 3x132 kW 40m³/h 75 bar feed water pumps, a 75 kW screw type air compressor and inside and outside battery limit piping have been supplied and erected. - A5 MVA 34.5/6.3 kV Power Transformer, a 1.250 kVa 6.3/0.4 kV distribution transformer, Low Voltage main distribution panel, boiler MCC panel and all the cabling have been supplied and erected. - To complete the project, a modern lightening prevention system, lighting and aero plane warning system, MCC panels, UPS and UPS-P panels, were supplied and installed.